Stainless Steel Tube and Schedule Piping
Supply, fabrication, and installation of stainless steel tubes and schedule piping for critical systems across various Execution of onshore piping projects, including installation and maintenance for a variety of industrial needs. industries.
RK Engineering offers comprehensive services for stainless steel tubes and schedule piping, ensuring high-quality solutions for critical systems across various industries. Our services include:
- Supply of Stainless Steel Tubes: Procurement of high-grade stainless steel tubes tailored for specific applications, ensuring durability and corrosion resistance.
- Fabrication and Customization: Precision fabrication of stainless steel tubes and schedule piping, tailored to meet project specifications and industry standards.
- Installation Services: Professional installation of piping systems designed for optimal performance in demanding environments, including the integration with existing infrastructure.
- Onshore Piping Projects: Execution of onshore piping projects, including thorough installation and maintenance for diverse industrial requirements.
- Maintenance and Support: Ongoing support for inspection, troubleshooting, and maintenance of piping systems to ensure reliability and compliance with safety standards.
RK Engineering is dedicated to delivering quality solutions for all your stainless steel tube and piping needs. Contact us for more information about our services and how we can support your projects!
Our Services
Design, preparation of fabrication drawings, shop fabrication and site erection of :-
1. Hoppers, storage tanks, weigh/day tanks in various sizes and different MOC stainless steel / carbon steel & other special materials for various end uses such
- Sodal
- Sodium Silicate
- Salphonic Acid
- Caustic Soda
- Furnace Oil
- HSD
- Brine solution & other chemicals.
2. Boiler flue gas & hot air generator chimneys
For Mylan Laboratories – Shop fabrication and site erection of boiler flue gas chimney height 42 meters and top Diameter 0.8 meters.
3. Stainless steel / carbon steel inlet / outlet chute, outlet vessel, buffer vessel, ventilation vessel, vapor pipe for dryers, CIP systems, filtration systems, storage silos, separators, condenser, vermarmer, various other chemicals equipment done for various projects across continents.
1) 750 KL fire water tanks / 500 KL oil storage tanks fabricated in modular network off site. The onsite welding done with automatic MIG welding process along with hydraulic jacking method used for safety site job.
2) Site fabrication, installation, alignment and commissioning of storage tanks, hygienic tanks, silos having length above 15 meters. These tanks are installed by circumferential seam welding of pre-fabricated sections and erected one above the other.
3) Unloading, shifting, installation, alignment and commissioning of various equipment such as LPG horizontal storage bullets, band driers, ovens, chemical vessels etc.
4) Dismantling and re-erection of unloading arm on new foundation at M/s Total LPG - Mangalore.
5) Fabrication, site assembly, installation and alignment of boiler flue gas & hot air generator chimneys.